Planning a piece of artefact
1) Ellie has been given three days to produce a textile throw as a prop for a stage play. She plans to decorate the three-metre-long throw with detailed-hand-embroidery.
- This would take more then three days to produce because Ellie is decorating it by hand.
- She needs to get people to help her finish.
2) Pria has a very small grant of £50 from a local charity to produce a piece of sculpture for the entrance hall of their local office. She has chosen to produce the piece in bronze using a hired bronze-casting workshop.
- She has to find the cost of the bronze-casting workshop.
- Make sure she has enough money for everything.
No comments:
Post a Comment